DES ALLEMANDS BREAKWATER BULKHEAD

Project Description

CONTRACT NAME: Des Allemands Breakwater Bulkhead Project

LOCATION: Des Allemands (Lafourche Parish, Louisiana)

APPROXIMATE CONTRACT VALUE:  $2,960,000

OWNER: Lafourche Parish Government

Scope of Work

The Des Allemands Breakwater Bulkhead project was an extremely important project for the residents of Des Allemands.  Situated in a low lying area of the state, this waterside community experienced flooding during most high water and storm events.  Cycle was the low bidder on the project to provide a new steel sheet pile bulkhead, which would provide a higher level of flood protection for the community.   This project was designed to utilize land based construction methods adjacent to many close houses and roadways.  Cycle discovered early in the process that Entergy power lines could not be de-energized or relocated to safely allow installation of the sheet piling and associated H-Pile tie back system.  As a result, Cycle got creative.  The Cycle team was able to develop a plan to use a specialized press-in pile system that would allow the piling to be installed with minimal vibration and noise impact to the adjacent residents.  This press-in system allowed for a much smaller footprint of area needed to install the piling.  Finally, Cycle made the decision to drive all of the H-Piles from a floating plant in the Bayou.   Despite these significant changes to the intended operations, Cycle was able to deliver the project ahead of schedule with no cost increase to the owner as a result of the changes.

Cycle installed approximately 1,200 linear feet of bulkhead consisting of 55,000 sf of steel sheet piles and supporting tie back piling and bracing.

PARKWAY PIPELINE NORCO PUMP STATION

Project Description

CONTRACT NAME: Parkway Pipeline Norco Pump Station

LOCATION: Norco, LA

APPROXIMATE CONTRACT VALUE: $1,410,000

OWNER: Parkway Pipeline, LLC / FHG Inc.

Scope of Work

Parkway Pipeline is a joint venture between Kinder Morgan Energy Partners and Valero Energy Corporation. This pipeline will have the capacity to transport 200,000 bpd of refined petroleum products from refineries in Norco, LA to Collins, MS.  Cycle is proud to have been a part in this important project to further develop the Oil and Gas resources of our region.  Cycle was hired by General Contractor FHG, Inc. to provide the site preparation and pile driving services on the Norco Pump Station phase of the work.   In addition to performing all of the excavation and site preparation for the project, Cycle installed approximately 239 steel H-piles, constructed a lined containment pond, installed underground sump tanks, and laid approximately 2,100 linear feet of underground drainage.